Here is a little progress update for each of the rooms in our house.  To amuse yourself, see if you can count how many different types of flooring there originally were throughout the house.  Answer below!

Exterior Before:
Exterior Progress:


What we have done:

  • Removed the old siding on 2nd floor and put in board and batten
  • Painted upper board and batten (Raindance by Benjamin Moore color-matched by Sherwin Williams) and lower siding (Rushing River by Benjamin Moore color-matched by Sherwin Williams)
  • Removed chimney on left side of house
  • Ripped out and rearrange garden beds (not pictured here)
Things we plan to do:
  • Put in gravel for driveway
  • Build a low deck all along left side
  • Add shutters to front windows
  • New gutters
  • Steel roof

Porch Before:
Porch Progress:
This is a bit of a spoiler since we haven't gotten to blogging about this built-in Andy just finished!

Things we have done:

  • Built-in storage
  • Painted all walls and trim white
  • Removed coat hooks
  • Painted ceiling blue (Flint Smoke by Behr)
Things we plan to do:
  • Wallpaper/stencil/paint far wall
  • Repair all screens
  • Replace light with fan/light
  • New door from interior to exterior
  • Possibly cover bottom cubbies with fabric
Kitchen Before:
Kitchen Progress:

Things we have done:

  • Removed curtains
  • Painted ceiling white
  • Painted walls (Flint Smoke by Behr)
  • Painted cabinets (Spanish Olive by Glidden)
  • Painted handles black
  • Removed paint from hinges (previous owners had painted all 30 of them faux wood!)
  • Replaced light (can't see it here but we got a great one!)
  • Replaced fridge (took this from our old house)
  • Replaced stove (took this from our old house)
Things we plan to do:
  • Paint trim/windows/doors white
  • Rip-up linoleum and refinish hardwood (we hope is still under)
  • Tear down wall leading to dining room and move stove
  • Build a peninsula or island
  • New counter tops (thinking wood or concrete...)
  • New blackspash (hard to see but the blacksplash now just continues from the counter tops)
Dining Room Before:
Dining Room Progress:



Things we have done:

  • Painted ceiling white
  • Painted walls blue (Flint Smoke by Behr)
  • Took down blinds
Things we plan to do:
  • Open up wall from kitchen
  • Rip-up linoleum and refinish hardwood (we hope is still under but are not too optimistic here)
  • Paint trim/doors/windows white
  • New light fixture
Living Room Before:
Living Room Progress:
Things we have done:

  • Painted ceiling white
  • Painted walls blue (Flint Smoke by Behr)
  • Took down curtains
  • Replaced ceiling fan (the new one is a flat black)
  • Tore up carpeting and refinished hardwood floors
Things we plan to do:
  • Widen doorway from kitchen
  • Paint trim/doors/windows white
Kids' Playroom Before:
Kids' Playroom Progress:
Things we have done:

  • Painted ceiling white
  • Painted walls taupe-ish color (Puddle by Behr)
  • Took down curtains
  • Replaced light
Things we plan to do:
  • NEW CARPET!!!! (this is top of our to-do list)
  • Paint trim/doors/windows white
  • Put in a double sliding door to deck
Master Bedroom Before:
Master Bedroom After:
Things we have done:
  • Painted dark wall purple/grey color (Milestone by Behr)
  • Painted light walls grey (Manhattan Mist by Behr)
Things we plan to do:
  • NEW CARPET!!!! (this is top of our to-do list)
  • Possibly repaint Manhattan Mist color... not loving it
  • Paint trim/doors/windows white
  • Curtains?  Blinds?
  • New ceiling fan
  • Paint ceiling
  • Paint/wallpaper closet doors
1st Floor Bathroom Before:













 1st Floor Bathroom Progress:
Things we have done:
  • Painted walls purple/grey color (Milestone by Behr)
  • New ceiling light
  • New shower curtain
  • Removed some of the handicap bars
Things we plan to do:
  • Phase 1:  paint vanity, new handles, new hardware, wood frame around mirror, new light above mirror, paint or wallpaper closet doors, new sink (scouring ReStores for a white one), paint trim/doors white, take down rest of handicap bars (possibly wait for this until the kiddos are potty-trained because they surprisingly come in handy!)
  • Phase 2:  New floors (maybe ceramic tile?), big walk-in shower with rain shower head, possible new layout
Laundry Room Before:
Laundry Room Progress:

Things we have done:
  • Painted walls and ceiling white
  • Replaced washer
  • Tore out ceiling drywall to replace upstairs bathroom plumbing 
  • Moved and painted coat hooks from porch
Things we plan to do:
  • Replace dryer
  • Move utility sink next to washer
  • Build built-in cabinet above laundry
  • Build bench, cubbies and coat hooks on opposite wall of washer/dryer
  • Paint trim/doors/windows white
  • Tear up linoleum and refinish wood floor (**crossing fingers**) underneath
Upstairs Office/Craft Nooks and Hall Before:

Upstairs Office/Craft Nooks and Hall Progress:












Things we have done:
  • Painted walls and ceiling white and green (Spring Cactus by Glidden)
  • Made the stair wall a half wall
  • Tore out closet for office nook
  • Widened doorway to craft area
  • Tore-up linoleum and painted wood floors
Things we plan to do:
  • Paint all trim white
  • Finish craft room- quilting table and built-in storage
  • New light for craft room and 2 hallway lights
2nd Floor Bathroom Before:
2nd Floor Bathroom Progress:
Things we have done:
  • Put our junk in
Things we plan to do:
  • Phase 1- Paint (This is the only room we haven't touched and I am stumped picking a color to "go" with the avocado tile and the flow with the rest of the house), new light with switch (a very dangerous pull cord above the sink right now), new medicine cabinet/mirror
  • Phase 2- Total tear-out and new layout, new floors, move doorway, double sink, tub with shower
F's Bedroom Before:
F's Bedroom Progress:
Things we have done:
  • Painted ceiling (Arctic Ocean by Behr)
  • Painted walls (Ancient Pewter by Behr)
  • Moved ceiling fan from living room and painted hardware silver and put on new globes
  • Tore out carpet and laid square tiles (classroom tiles)
  • Painted all off-white trim/doors/windows white
Things we plan to do:
  • Build and organizer/shelving system for closet with a possible double door
  • Window coverings/blinds
E's Bedroom Before:
This room is affectionately referred to as the "Hobbit" room because of the silly little door.  When we first looked at this house, E immediately took a dive on the old cot still in the room.  She got a good scrubbing in the tub that night...
E's Bedroom Progress:


Things we have done:
  • Painted white 
  • Painted walls (Phantom Mist by Behr and Memories by Behr on window wall)
  • Put in new ceiling fan
  • Tore out carpet and laid square tiles (classroom tiles)
  • Painted all off-white trim/doors/windows white
  • Put up removable, sticker-like flowers
  • Replaced window
  • Put up curtain
Things we plan to do:
  • Tear out paneling and insulate and drywall
  • Build bookcases in flat parts of walls
  • Build built-in two twin beds on either side of window
  • Build built-in wardrobe next to door
  • Put in 2 dormer windows in slanted walls
So, that is it!  Looking back, I am sort of surprised we even bought the house though I am really glad we did.  It has already come a long way and I am so excited to see all the potential that is there.  Did you tally up how many different floors the house started with?  If you got 9 you are correct!!  We are down to 8 different floors now and hopefully working toward lowering that number yearly!